New Build Update: We’re entering the home straight!

Anyone passing our new building at the moment will see straight away: this isn’t just a building site – the future is being shaped here. We’re right in the thick of it, and everyone is working flat out on all fronts to ensure the move goes off without a hitch. There’s a smell of fresh paint and a real sense of excitement in the air at Tuchel Maschinenbau.

Visibility from all angles: our new advertising display
This marks a milestone for the Tuchel Maschinenbau brand: our new logo has been mounted on the building since last week – and it’s making a huge impact. Visibility was particularly important to us during the planning stage, and the result has exceeded our expectations.

Whether you’re driving past at high speed on the motorway, using the main road or approaching the site from the side – our advertising structure is now a real eye-catcher from every direction. It not only serves as a landmark but is also a symbol, visible from afar, of our consistency and innovative spirit at this site.

Dynamism outdoors: The foundation for seamless logistics
Outdoors, there is currently a high concentration of heavy machinery. We are preparing the site to meet the demanding requirements of our production and logistics operations:

  • Large-scale earthworks: The site is being finalised to create seamless transitions between the production halls and the logistics areas.
  • Infrastructure & drainage: Beneath the surface, the final pipes and systems for the outdoor facilities have been completed, ensuring the site remains fully functional even in adverse weather conditions.
  • Final push before asphalting: The sub-base is currently being compacted and levelled with the utmost precision. This is the crucial step before the large asphalt pavers roll in shortly to seal the access roads and parking areas. This will give the entire site its clean, modern and functional look.

Inside: Rooms are being transformed into workspaces
Whilst rough work sets the tone outside, the interior is characterised by the precision of the fit-out:

  • Trades working in harmony: Whether it’s drywall installation, painting or laying floor coverings and tiles – the teams are working hand in hand.
  • Technical finishing touches: The electrical installations and the heating, ventilation and plumbing systems are currently being finalised and tested.
  • The interior is on its way: The team is absolutely buzzing with anticipation, as the interior fittings and office furniture will be moving in from next week. Then the building site will finally be transformed into our new, modern working environment.

We’re heading into the home straight at full speed and can’t wait to be up and running in full at our new premises soon!